Planning of an offshore platform maintenance campaign: a collective process to reduce uncertainty

Data

Título da Revista

ISSN da Revista

Título de Volume

Editor

Universidade do Estado de Santa Catarina (UDESC)

Resumo

Descrição

Within the scope of industrial megaprojects, such as a large-scale maintenance campaign for an oil platform, planning for tasks that will be executed in highly dynamic environments – defined by variability, uncertainty, and unforeseen events – is a challenging job. The Ergonomic Work Analysis (EWA) by the maintenance planning technicians showed that, despite the different strategies in use, there are limits in the possibility of predicting a future context. Thus, planning is a collective process of reducing uncertainty, but it requires instrumentalization of the players involved therewith.
No âmbito dos megaprojetos industriais, como uma campanha de manutenção de grande porte de uma plataforma de petróleo, é desafiador planejar tarefas que serão executadas em ambientes altamente dinâmicos – marcados por variabilidades, incertezas e eventos imprevistos. A Análise Ergonômica do Trabalho (AET) dos técnicos de planejamento da manutenção mostrou que, apesar das diferentes estratégias utilizadas, existem limites na possibilidade de antecipação do contexto futuro. Assim, o planejamento é um processo coletivo de redução da incerteza, mas que demanda a instrumentalização dos atores implicados nele.

Palavras-chave

ergonomia centrada na atividade, planejamento, megaprojeto industrial, ambiente altamente dinâmico, manutenção offshore, activity-centered ergonomics, planning, industrial megaproject, highly dynamic environment, offshore maintenance

Citação